Country Inns & Suites
Marion IL
Zeller Construction was selected as the Design – Build contractor for this project. A 3-story, 41,000 s.f. hotel with indoor pool. The facility was completed and open for service on December 20 2008 just 8,5 month construction schedule.
This project is a 14,000 s.f. fire station, 7,200 s.f. of administrative and living area and 6,8– s.f. of garage area. This tilt-up concrete building is designed as an ESSENTIAL FACILITY to be able to provide services after a disaster.
Marion Cultural & Civic Center
Design – Build Project
This state of the art $8 Million municipal entertainment facility is theĀ focal point of town square.
When construction was completed in April of 2004, Zeller Construction value engineered over $2 Million in project savings.
Aisin Manufacturing of Illinois
Phase I and II:
Zeller/ Doster, a joint venture was the construction manager for this $32 Million manufacturing facility. Phase I was completed in just under 11 month in 2002. Phase II was completed in 6 month in 2004
Golden Eagle Distribution Center
Zeller Construction was the general contractor on this $1.35 million Budweiser distribution center. The project was completed in just over 6 months.
Best Western Hotel
Zeller Construction Design – Build Project
The project was a 2-story, 32,000 s.f. hotel with indoor pool. Construction documents were completed in just 8 weeks and construction was completed in under 7 months.
The Design – Build Team battled the winter while constructing the 22,000 s.f. Concrete Tilt Structure that Black Diamond Harley-Davidson needed due to their increase in sales. The owners of Black Diamond needed an additional warehouse area to assemble bikes and house trade-in vehicles.
Zeller Construction was chosen to be the general contractor on this $3.8 Million addition and historical restoration project. Great care was taken in the restoration of details of this project. Zeller delivered this historical project in 11 months.
As the design – build contractor for this $2 Million automobile dealership, Zeller Construction worked closely with the owner to accomplish the standard building appearance desired by Ford Motor Company. Zeller designed, permitted, and constructed this facility over a 9 month period.
To accommodate one of the regions fastest growing businesses, Zeller Construction was the design/ build contractor for this $1.6 Million branch facility. The team completed this Tilt Up Concrete construction project in just over 7 month.
The total project value was $12 Million for this cutting-edge new facility. The new Health Services Facility is the largest student health facility in the nation with over 64,000 s.f.
Venegoni Distribution Center
Zeller Construction was the design – build contractor for this $2.2 Million Budweiser distribution center. Zeller provided over $75k in value engineering savings and delivered the project to the owners in 7 months.